Tweed Court

Client: Portsmouth City Council

Site Location: Tweed Court, Dunsbury Way. Havant, Hants, PO9 5DB

Contract Period: Section 1 – phase 1
GF (south wing)
Section 2 – phase 2 Start: 31.07.14 Finished: 01.10.14
GF (north wing)
Section 3 – phase 3 Start Date: 02.06.14 Finished: 24.07.14
FF (south wing)
Section 4 – phase 4 Start Date: 11.12.14 Finished: 18.02.15
FF (north wing)
Section 5 – phase 5 Start Date: 25.02.15 Finish: 28.04.15
SF (south wing)
Section 6 – phase 6 Start Date: 05.05.15 Finish: 30.06.15
SF (north wing)
Project Value: £1.4m

Form of Contract: JCT Intermediate Building Contract with Contractor’s Design 2011

Project Description: Tweed Court is a sheltered housing location for the elderly and vulnerable. It is a category two sheltered scheme outside of the city limits in the area of Leigh Park. This is a scheme that provides on-site housing related support to residents, working with Adult Social Care, Health and other agencies. The level of support varies to meet the needs and demands of the residents.
There are 44 properties, comprising 33 bed-sits, 9 one-bedroom flats and 2 two-bedroom flats. This submission relates to alteration & refurbishment works to the entire block of 44 flats.
The works include the reduction in the number of flats to 31 to form more up to date and spacious accommodation by combining flats. These enlarged flats will bring the accommodation up to market expectations, reduce voids and improve long term viability of the location.

Key Personnel: Mr Oliver West – Quantity Surveyor
Mr Martin West – Contracts Director
Mr Kenny Parkes – Site Manager
Mr Gary Barton – Site Foreman


Subcontractors: Medway Mechanical Ltd
Walkers Electrical Ltd
Solent Flooring Ltd
Gypsum Plasterers